Location: Norwich, CT, USA
Application: Technical High School
Products Used: StrataSlope System
Project Scope: Near-Vertical Vegetated Reinforced StrataSlope
Structure Height: Maximum wall height was 15 ft. (9000 face square feet)
Contractor: Mizzy Construction
Design/Build: Richter & Cegan Landscape Architects
Date Constructed: 2007