Clemson Road BridgeStratagrid SG200 satisfied the structural requirements for the steepened soil slope. The bent, welded-wire form facing system accommodated both the concrete slope protection and vegetation. The reinforced slope eliminated the costly need for lengthening the bridge span or constructing a structural wall and provided the additional right-of-way required for the access road. StrataSlope gave SCDOT the best solution, making the project both structurally and economically sound. To download complete Case Study PDF, click on image on right.
 Donzi LandfillThe design and construction of a Stratagrid-reinforced retaining structure around the existing Donzi landfill provided a safe, highly engineered method of expanding this tightly-restricted landfill. It was constructed with the landfill operator's own crews, and the completed project resulted in more than 3 million additional cubic yards of volume. To download complete Case Study PDF, click on image on right.
|